Wind Farm Vader Piet Aruba

You and your listed project partners can edit this project

Project information

In February 2008 the Water and Electricity Company Aruba ("WEB") requested for proposals to "build, own and operate" wind farm Vader Piet and to supply all related electricity to WEB. The Vader Piet wind farm consists of 10 turbines of the Vestas V90 type with a hub height of 80 metres. The foundations consist of circular concrete bases with a diameter of 13 metres, which are anchored in the limestone rock. The 24 GEWI anchors have a steel diameter of 63 mm and are drilled into the rock to a depth of 10 metres (drill diameters of 200 mm). Several test anchors were installed to examine the behaviour and bearing capacity of this rock. Due to its high capacity, it was possible to strongly reduce the size of the foundation bases. The sub soil was also subjected to plate bearing tests. Based on the test results, an inspection programme was performed. In total, the Vader Piet wind farm produces 20% of Aruba’s total electricity needs.

Description: General
General

Tags

Expertise Features or specials

Team Wind Farm Vader Piet Aruba

Association Articles

Logo
Name
Article title

Location

Related projects

No results found

Uploading a picture is currently only possible if you worked on this project and your company is listed in the team.
You're now following Wind Farm Vader Piet Aruba. Click here to see everything you're following.
You stopped following Wind Farm Vader Piet Aruba
Project added to your favorite projects. Click here to see your favorites.
Wind Farm Vader Piet Aruba is removed from your Favorites

Click the +Favorite button to add this project to your personal favorites